State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: MANGLIYA
Work Code: 1719006010/RC/22012034447545 (cc road nali nirman kary gram adlimkhedi gp mangliya)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2019 Work start date : 26/2/2019
Present status : No Road Proposed Status : Constr of Cement Concrete Roads for Comm
Tech Sanction Details
Technical Sanction No. : 737/2019 Sanction Date : 18/2/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
22806 0 0 0 129234 0 0 130000 0 152040
Financial Sanction Details
Financial\Administrative Sanction No: 10/10 Financial\Administrative Sanction Date 20/2/2019
Fin. Sanc. Amt. (in Rs) NREGA:22806 Panchparmeshwar
129234
Scheme 2
0
Scheme 3
0
Total
153000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil82.470.85833.92
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)15.13075.646441.56
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)15.12204.633289.46
4False work for R.C.C. and P.C.C. work in plinth and foundation76.8185.414238.72
5Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau82.4576.947536.56
6Field Technical Supervisior Charge-FTSC147004700
Total Activity 153000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges1129234129234
Total Material 130000