S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1000 | 1000 |
2 | Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like. | 81 | 49.1 | 3977.1 |
3 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 5.49 | 2962.1 | 16261.929 |
4 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 139.04 | 170.9 | 23761.936 |
5 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 215.46 | 67.8 | 14608.188 |
6 | Collection of stone chips. quarry spalls or rubble (maximum size 0.004cum) Black trap, basalt or granite.-Other then black trap Basalt or granite | 9 | 112.8 | 1015.2 |
7 | Transportation of metal | 9 | 108.18 | 973.62 |
8 | Transportation rates for Lime (fat), Hydraulic or any other. | 18 | 132.23 | 2380.14 |
9 | Providing and laying in trenches 6.0kgf/sqcm working pressure polyethylene pipes of the following outside diameter high density complete with special flange compression type fitting (earth work in trenches is to be measured and paid for separately)-50 mm dia. | 4 | 61.4 | 245.6 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 20.08 | 119.7 | 2403.576 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work | 100.4 | 140.85 | 14141.34 |
12 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/30/30) | 47.49 | 407.1 | 19333.179 |
13 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work | 118.73 | 606.88 | 72054.8624 |
14 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 9 | 139.1 | 1251.9 |
15 | contingency | 1 | 5064 | 5064 |