Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 10:26:27 AM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: AITHAAR
Work Code: 1702001027/RC/382 (सी सी रोड पंचो की र्जगा से धनोरिया के दरवाजे तक)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 22/4/2012 Work start date : 20/9/2012
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 62 Sanction Date : 3/7/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
76800 51200 0 0 230000 0 0 282000 0 358000
Financial Sanction Details
Financial\Administrative Sanction No: 7405 Financial\Administrative Sanction Date 9/8/2012
Fin. Sanc. Amt. (in Rs) NREGA:128000 Panchparmeshwar
230000
Scheme 2
0
Scheme 3
0
Total
358000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Double spade "v" shaped stroke 100mm deep4500.4180
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.76.35378.628906.11
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)82.352511.5206822.025
5False work for R.C.C. and P.C.C. work in plinth and foundation130.05129.616854.48
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)2675.81548.6
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 76.354.8366.48
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 82.3526.82206.98
9Transportation of 20 MM metal70.005511.235786.556
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.13520035200
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work91.3567.86193.53
12contingency11521015210
13Labour difference in case of old SoR158055805
Total Activity 358000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)19726051220
2Convergence Amount1230000230000
Total Material 282000