Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:56:36 PM 
Back  
State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: BARHA BADA
Work Code: 1734004056/RC/22012034202789 (MITTI BAJRA 266 CEMENT PULIYA SE LALMAN KI TARAF B)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/2014 Work start date : 25/1/2014
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 266/13-14 Sanction Date : 20/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
298000 197000 0 0 0 0 0 197000 0 495000
Financial Sanction Details
Financial\Administrative Sanction No: 07/13-14 Financial\Administrative Sanction Date 25/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:495000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
495000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.2281.83.78442.66
2Contingency11216012160
3Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 1437.536.59343.945
4Transportation of sand752.99108.9982068.3801
5Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.640.54131.484166.956
6Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.71437.5321.330619.389
7Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.152647.539712.5
8Fixing 12.5 litres low and high level flushing cistern with a pair of C.I. Or M.S. brackets complete with fittings each as lead valve loss syphon. 15mm nominal size brass ball valve with polythene float, C.P. brass handle, unions and couplings for connect-Vitreous China white colour high level182.5490.416501.616
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work889.973.465318.66
10Collection of soft moorum including stacking at quarry.1437.53102146628.06
Total Activity 495000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges115151515
2Display board115001500
3pipe ac15378056700
4Rollaring182.5490.416501.616
5Soft Murum transport752.9973.3555231.8165
6transportation of hard muram 1684.5495.7665551.5504
Total Material 197000