S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1600 | 1.8 | 2880 |
3 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Loose or soft soil | 2053.5 | 87.8 | 180297.3 |
4 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil | 1521 | 78.1 | 118790.1 |
5 | TRANSPORTATION OF MATERIAL | 63 | 1000 | 63000 |
6 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 222 | 212.1 | 47086.2 |
7 | Transportation of metal | 84 | 171 | 14364 |