State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: RAMSALAIYA
Work Code: 1711006060/RC/22012034291177 (c.c.road/ sala bhawan se kishan ke ghar / ramsalaiya)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 6/8/2015 Work start date : 3/12/2015
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : ts/266 Sanction Date : 16/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
70000 47000 0 0 252000 0 0 299000 0 369000
Financial Sanction Details
Financial\Administrative Sanction No: as/8/60 Financial\Administrative Sanction Date 19/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:117000 Panchparmeshwar
252000
Scheme 2
0
Scheme 3
0
Total
369000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency7.24310007243
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil22.5110.62488.5
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)75.383474.1261877.658
5False work for R.C.C. and P.C.C. work in plinth and foundation96.56179.117293.896
6TRANSPORTATION OF MATERIAL65100065000
7Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Dence or hard soil37511.24200
8Collection of hard moorum including stacking at quarry.56.25142.58015.625
Total Activity 369000
S.NoMaterialQuantityUnit PriceTotal
1Centering and Shuttering101001000
2complite materail punch parmes1252000252000
3Transpotation Charges14600046000
Total Material 299000