S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 6000 | 6000 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 6000 | 4.1 | 24600 |
3 | Contingency | 1 | 31380 | 31380 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 1052 | 87.6 | 92155.2 |
5 | Chain and compass survey.-Headworks/Other Works | 1 | 584 | 584 |
6 | Fly levelling for fixing temporary bench marks.-Upto 15 m interval | 1 | 438 | 438 |
7 | Levelling - Headwork.-Below 5 m interval | 1 | 467 | 467 |
8 | Levelling - Headwork.-5 to 10 m interval | 1 | 1460 | 1460 |
9 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 1197 | 21.5 | 25735.5 |
10 | Transportation of metal | 500 | 276.4 | 138200 |
11 | Transportation rates for Lime (fat), Hydraulic or any other. | 2197 | 121.5 | 266935.5 |
12 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 1197 | 41 | 49077 |
13 | Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia | 20 | 310.2 | 6204 |
14 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 973.35 | 18.3 | 17812.305 |
15 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 1957 | 19.8 | 38748.6 |
16 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1 | 5933.7 | 5933.7 |
17 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 3069 | 81.2 | 249202.8 |
18 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 1021 | 4 | 4084 |
19 | Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete ) With Local Stone (i) 5th Kilometre Stone (ii) Ordinary Kilometer Stone (iii) 200 m stone | 720 | 130.8 | 94176 |
20 | 1902 Transportion of metal | 240 | 114.3 | 27432 |
21 | R C C Pole Fixing only | 600 | 80.5 | 48300 |
22 | Barbed wire Fixing only | 600 | 61.5 | 36900 |
23 | Collection/Excavation of Gravel Material meeting the requirements of Hard moorum as detailed in RES SOR chapter No. 03 Notes Clause 3.2(C) including stacking and all leads and lifts up to the loading point at quarry. | 210.96 | 130.8 | 27593.568 |
24 | Collection of river Borne material (RBM)(any mixture of sand & gravel)i/c boxing and all leads and lifts up to the loading point at quarry. | 492.24 | 114.3 | 56263.032 |
25 | Stacking of Gravel or Hard Moorum at site without Boxing. | 703.2 | 25.6 | 18001.92 |
26 | Spreading of material mixing by mix in place method by manual means or by tractor mount disk harrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2,2.2.2.3,2.2.3.1 and 2.2.3.2 of IRC SP: 77-2008 and grading by tractor mount. | 703.2 | 80.5 | 56607.6 |
27 | Setting out work (Reference pillars referencing bench mark and temporary bench mark):Painting/Marking of Reference/Working Bench Mark over existing permanent structure Fixing of Reference pegs made of local rough wood for making centre line and toe lines. Fixing of reference poles made of bamboos or jungle wood bellies etc. | 1 | 7462.9 | 7462.9 |