State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: NAHAR MAL
Work Code: 1725007049/RC/22012034202452 (पंच परमेश्‍वर सीसी रोड कैलाश बुघ्‍दू के घर से पुरा)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/9/2013 Work start date : 15/9/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 148& Sanction Date : 25/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
44000 29000 0 0 140000 0 0 169000 0 213000
Financial Sanction Details
Financial\Administrative Sanction No: 21& Financial\Administrative Sanction Date 27/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:73000 Panchparmeshwar
140000
Scheme 2
0
Scheme 3
0
Total
213000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil54.2681.24405.912
2Dag-beling-Single spade stroke minimum 75mm deep2280.5114
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m035.80
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)47.293177.8150278.162
5Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used47.29118.65608.594
6False work for R.C.C. and P.C.C. work in plinth and foundation68.4154.210547.28
7Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)766.3478.8
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 48.847.5366.3
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 47.29401891.6
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.119.76165.4319811.8968
11Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7141.3723.63336.332
12Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)135118.816038
Total Activity 213000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL100040.1940190
2CEMENT(BEGS)30030090000
3Display board200012000
4mixer machin (perday)10001010000
5murrom481004800
6photocopy502100
7photographs425100
8Plastic40401600
9SAND2050010000
10sand cum000
11Thermocoal20501000
12Transpotation Charges102002000
13Vibrator (Per Day)103003000
14Water With Tenkar85004000
Total Material 169000