S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1000 | 1000 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 6400 | 0.3 | 1920 |
3 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 8 | 260 | 2080 |
4 | Transportation of metal | 159.84 | 107.19 | 17133.2496 |
5 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 740 | 18.86 | 13956.4 |
6 | Barbed wire of 12 gauge as per MPLUN/ MPAGRO specification. | 200 | 84 | 16800 |
7 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants. | 813 | 159 | 129267 |
8 | Supply of farm yard mannure (FYM) to the plantation site. | 740 | 10 | 7400 |
9 | Transportation of fertile soil with in 5 km range from plantation site for filling in diging pits quantity will we 1/2 of pit size each pit. | 1480 | 12 | 17760 |
10 | Supply of singal super phosphate (SSP) | 370 | 8 | 2960 |
11 | Supply of muriate of potash (MOP) | 185 | 22 | 4070 |
12 | Supply of urea. | 185 | 8 | 1480 |
13 | Supply of Themate, phorate 10 G pesticites | 18.5 | 90 | 1665 |
14 | Supply of foresty or horticulture Plant cost 3 to5 feet . height | 222 | 30 | 6660 |
15 | Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant. | 1480 | 5 | 7400 |
16 | Field Technical Supervisior Charge-FTSC | 1 | 8237 | 8237 |