S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 2082.62 | 1.8 | 3748.716 |
3 | Work charge | 1 | 42575 | 42575 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 6816.004 | 52.7 | 359203.4108 |
5 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 63.369 | 52.7 | 3339.5463 |
6 | Dag-beling-Single spade stroke minimum 75mm deep | 347.104 | 0.3 | 104.1312 |
7 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 1363.199 | 23.9 | 32580.4561 |
8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 10.41 | 39 | 405.99 |
9 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 4.078 | 3474.1 | 14167.3798 |
10 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 7.17 | 2603.5 | 18667.095 |
11 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:5 (1cement, 5sand) | 62.53 | 2343.7 | 146551.561 |
12 | TRANSPORTATION OF MATERIAL | 1 | 135479 | 135479 |
13 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 45.99 | 89.9 | 4134.501 |
14 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 1254.26 | 212.1 | 266028.546 |
15 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 369.02 | 2.2 | 811.844 |
16 | Transportation of sand | 80.54 | 133.83 | 10778.6682 |
17 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 369.02 | 133.83 | 49385.9466 |
18 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 80.54 | 44.7 | 3600.138 |
19 | FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc. | 632.52 | 165.4 | 104618.808 |
20 | Collection of puddle earth including stacking at quarry | 369.02 | 122.8 | 45315.656 |
21 | Collection of hard moorum including stacking at quarry. | 80.54 | 142.5 | 11476.95 |