State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KAMAI
Work Code: 1702001071/WC/22012034394060 (NAVEEN TALAB NIRMAN KAMAI)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 16/6/2018
Present status : Existing Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 3468 Sanction Date : 7/6/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
431000 297000 0 0 0 0 0 297000 0 728000
Financial Sanction Details
Financial\Administrative Sanction No: AS 02/2018 Financial\Administrative Sanction Date 11/6/2018
Fin. Sanc. Amt. (in Rs) NREGA:728000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
728000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises10000330000
2Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil2136.32172.46368429.7472
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)96.112562.5246281.875
422cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.01416816527720
5Transportation of metal 86.4183.1615825.024
6FOR EARTHEN DAM - Excavation of puddle trench for earthen embankment to proper side slopes and bed grade including shoring wherever necessary dressing 50m lead and 1.5m lift120.1752.76332.959
7FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.52.247424742.8
8FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders14.4574.68274.24
Total Activity 728000
S.NoMaterialQuantityUnit PriceTotal
122 CM Piching Bolder Supplyes100.816516632
2Boulder Transportation8.5574.64884.1
3Cement15829546610
4Hearting Soil327172.4656394.42
5Lead of Casing Soil 4.00 Km35.2183.166447.232
6गिटटी 20 एम एम691550106950
7रेत43.25135058387.5
Total Material 297000