S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1912.5 | 7.02398431372549 | 13433.37 |
2 | Providing stone chips under stone pitching | 472.5 | 608.10273015873 | 287328.54 |
3 | (a) Other then black trap Basalt or granite | 504 | 350.661607142857 | 176733.45 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 2903.85 | 2.52450023245002 | 7330.77 |
5 | (III) 1.5 Km. Lead | 1126.912 | 107.795275939914 | 121475.79 |
6 | (VIII) 4.0 Km. Lead | 1776.938 | 148.868908200511 | 264530.82 |
7 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 170.1 | 452.889770723104 | 77036.55 |
8 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 2186.438 | 22.9305610312298 | 50136.25 |
9 | b (iii) Dense or hard soil for Tank Work | 933.188 | 144.074998821245 | 134449.06 |
10 | c (iii) Hard moorum for Tank Work | 1681.931 | 191.907896340575 | 322775.84 |
11 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 49.95 | 611.771771771772 | 30558 |
12 | b (i) Hard rock requiring blasting for Tank Work | 6 | 645.2 | 3871.2 |