Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:08:45 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: MASTURA(P)
Work Code: 1703004063/WC/22012034710200 (CTR SOAK PIT NIRMAN HANDPUMP SAI MOHALLAMASTURA)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2021 Work start date : 15/5/2021
Present status : Non-existent Proposed Status : Construction of Recharge Pits for Community
Tech Sanction Details
Technical Sanction No. : 1703004/2021-2022/256504/TS Sanction Date : 24/5/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
12409.61 8025.57 142.18 338.33 0 0 0 8600 0 20915.69
Financial Sanction Details
Financial\Administrative Sanction No: 1703004/2021-2022/256504/AS Financial\Administrative Sanction Date 24/10/2021
Fin. Sanc. Amt. (in Rs) NREGA:20916 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
21000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m2758.51777777777781579.98
2(j) Cement mortar 1:6 (1cement, 6sand)0.773931.584415584423027.32
3(d) Cement mortar 1:6 (1cement, 6sand)7.44141.5564516129031053.18
4(X) 5.0 Km. Lead27195.2633333333335272.11
5c (iii) Hard moorum for Tank Work27.45181.5599271402554983.82
6Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.13.5163.5674074074072208.16
7Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.6.75228.1214814814811539.82
8Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.6.75185.3762962962961251.29
Total Activity 21000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.01445188512.789135
20084-Hire charges of Diesel truck - 9 tonne (without POL)1.1960708822422681.59091296
30367-Portland Cement0.0722555511398.197305
40983-Fine sand (zone IV)0.30925141076.25332.83181925
51235-Diesel oil13.8624614868942.64738064
65001-Mobil oil0.49038906182.989.692159074
77900-Modular common burnt clay bricks of class designation 7.5402.484.131662.2424
Total Material 6200