S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Excavation in earth for all sorts of soil & silt, lime, shadu, sand/ grit, such types of strata including dressing and conveying the excavated material by head and upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto lift of 1:50m as directed. (A) Excavation - (In General) Tribale janjati | 0.65 | 120.892307692308 | 78.58 |
2 | Excavation in earth for soft murum type of strata including dressing and converying the excavated material by head load upto a distance of 10m and laying or spereading or filling in furrahas in layers of 30cm. Thick upto a lift of 1.50m as directed. (A) Excavation - (In General) tribal janjati | 0.79 | 153.151898734177 | 120.99 |
3 | Conveying soft/hard murum/silt/sand/grit or all sorts of soil at the work site, from the collected stacks, spreading, laying and sectioning / dressing etc. complete. (does not include lead)
Tribal Janjati | 0.29 | 48.2758620689655 | 14 |
4 | Preparing 80 mm. to 100 mm. size metal from stone/boulders of size 20cm to 30cm in general made available at stone quarry site or road side, already blasted and broken and stacking the same on spot or filling in furrah (This does not include the cost of blasting at quarry site & breaking large size stones) (Expenses of drilling, blasting and secondary breaking are not included)
For tribal / hilly area | 1.19 | 239.260504201681 | 284.72 |
5 | Conveying metal of all sizes from stacks, spreading/laying and sectioning/dressing est. doing all such works.
For tribal / hilly area | 1.19 | 60.5546218487395 | 72.06 |
6 | Providing, laying & fixing P.V.C. pipe of 75mm dia. with fitting such as bends, tees, reducer, clamps,etc.including necessary excavation, trench filling etc. complete. | 1 | 307.91 | 307.91 |
7 | Man days for unskilled | 0.05 | 248 | 12.4 |
8 | P/F reinforcement cement concrete round tank 0.60 dia and 0.90m height with cover (local rates) (0.15cm dia 4 no of holes at a distance of 0.30 cm from top PVC pipe and green net as per market rate) | 1 | 1425 | 1425 |
9 | supplying sand at the road side,including conveying and sectioning etc.complete | 0.29 | 1341.44827586207 | 389.02 |