State: MADHYA PRADESH District: KHARGONE Block: BHAGVANPURA Panchayat: DHARMPURI
Work Code: 1724008022/RS/22012034353860 (toilet nirman ansing kerla dharampuri)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2017 Work start date : 18/6/2017
Present status : Not Exist Proposed Status : Individual Household Latrines
Tech Sanction Details
Technical Sanction No. : 4255/172177/26 Sanction Date : 15/6/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
3000 9000 0 0 0 0 0 9000 0 12000
Financial Sanction Details
Financial\Administrative Sanction No: 49/2017-18 Financial\Administrative Sanction Date 17/6/2017
Fin. Sanc. Amt. (in Rs) NREGA:12000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
12000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises130003000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.104.141
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil000
4Filling foundation and around masonry work with moorum I/c ramming layers and watering.0.68156.3106.284
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal)0.242090501.6
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand)0.142947412.58
7Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:46.393872472.93
8Honey comb brick masonry with class 25 open bhatta or pajawa burnt brick 10cm Thick.-In cement mortar 1:47.62111603.6
9Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height5.573.1402.05
1015mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)2.7116.3314.01
11Pointing on stone slab ceiling with cement mortar 1:2 (1 cement, 2 sand)-Flush pointing0.1484981189.72
12Providing 6mm thick corrugated asbestos cement sheets roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm dia. G.I. plain and bitumen washer complete excluding the cost of purlines rafters and trusses.1.54344.2530.068
13Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.0.56201112.56
14Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-50 mm thick.1568568
15White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement.0.64752.4481.536
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work3.1769.9221.583
Total Activity 12000
S.NoMaterialQuantityUnit PriceTotal
1Bricks80043200
2Cement83002400
3DOOR 1111221122
4Farshi1230360
5PVC Pipe1030300
6Sand (mortar)0.51500750
7Transpotation Charges111
8WC SHEET1550550
9WHITE WASHING1300300
Total Material 9000