State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: GHATERA
Work Code: 1711006006/IF/1378 (कपि‍ल धारा कूप र्नि‍माण कार्य/ हीरा उमराव सींग गौंड/ घटेरा)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/8/2011 Work start date : 1/9/2011
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 006/309 Sanction Date : 1/9/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
136000 86000 0 0 0 0 0 86000 0 222000
Financial Sanction Details
Financial\Administrative Sanction No: 006/04 Financial\Administrative Sanction Date 30/9/2011
Fin. Sanc. Amt. (in Rs) NREGA:222000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
222000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Double spade "v" shaped stroke 100mm deep6000.5300
2Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead288.821.96324.72
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m132.1135.84729.538
4Labour only for item no. 04048.129.8241.38
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.583089.91792.142
6Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used0.58169.498.252
7Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.57.581043.660090.488
8Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)3.521835.36460.256
9Labour only for item no.05180.853120.92652.765
10Add extra for brick masonry circular in plan, I/c wells to a mean radius not exceeding 6m (Such as well stening and other similar type of works)61.1265.516222.05
11Add to item no.0605 and 0609 for well staining-For every 3meter up to 15 meter depth.93.42172.316096.266
12Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:3 (1cement, 3sand)-Ruled pointing20.1585.11714.765
13Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 1 (Size ranging from 90 mm to 45 mm)8.1240.61948.86
14Labour only for boulder soling hand packed excluding consolidation.10.8106.21146.96
15Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal, grade-1 As per MOST 2004 clause 400.2.5 including dressing.8.172.9590.49
16Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m1685.37.111965.63
17Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m63.29.4594.08
18Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m539.810.65721.88
19Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m38412.94953.6
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work281.7119.733719.49
21Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed- Dense or hard soil for Tank Work126.981.210304.28
22Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work84.2130.210962.84
23Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work29.22353.210320.504
24Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work22.6477.210784.72
25Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.10.8100.31083.24
26Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.8.488885694139.11180.8040000354
Total Activity 222000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL0.5650325
240 M.M. METAL1.4375525
3Blasting Holas301003000
4Cement95605040
5desal pump rent75003500
6Display board120002000
7First Aid Box1500500
8MASON (PERDAY)7026718690
9Masonry Stone6244027280
10P V C PIPE 21500500
11Photo copy1005500
12Photograph1050500
13Sand2.566501664
14Transpotation Charges12190021900
Total Material 86000