State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RICHHARIKHURD(P)
Work Code: 1703004070/RC/22012034297360 (sudoor khet sampark sadak nirman ranveer ke kher se naval singh ke khet tak)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 3/10/2015 Work start date : 23/1/2016
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 4360/070 Sanction Date : 14/12/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
691000 409000 0 0 0 0 0 409000 0 1100000
Financial Sanction Details
Financial\Administrative Sanction No: 38/070 Financial\Administrative Sanction Date 18/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:1100000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1100000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.21004.18610
2Contingency11130611306
3Dag-beling-Single spade stroke minimum 75mm deep20.20.4
4Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.1302100.53130890.06
5Transportation of sand420200.6184256.2
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.231167.3138648.61
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.130244.758199.4
8Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural315444.4139986
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making176433.258564.8
10Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact130238.449996.8
11Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)23150.611688.6
12Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:105504.853004
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work2446.588.4216270.6
14Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil7647045290
15Collection of soft moorum including stacking at quarry.1302122.8159885.6
16Collection of hard moorum including stacking at quarry.231142.532917.5
Total Activity 1100000
S.NoMaterialQuantityUnit PriceTotal
140 MM Metal Transportation315254.480136
2Bolder56003000
3Compaction of Muram12700027000
4contengency no190229.843662
5Roller20210042000
6SIGN BOARD NO150005000
7TANKER TRIPP19180034200
8Transportation of Muram130259.9578054.9
9Transpotation Charges338283.3295762.16
Total Material 409000