State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DEVRA
Work Code: 1713004041/RC/22012034379368 (sudur sampark sadak ramwati soni mungaha tola se sujwar pahuch marg harigovind evam budhsenkushwaha)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : Yes
Proposal Date : 2/10/2017 Work start date : 20/12/2017
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 596/4041 Sanction Date : 12/12/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
409000 908000 0 0 0 0 0 908000 0 1317000
Financial Sanction Details
Financial\Administrative Sanction No: 19/4041 Financial\Administrative Sanction Date 18/12/2017
Fin. Sanc. Amt. (in Rs) NREGA:1317000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1317000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard159345934
2Survey & Investigation1.1753074.83612.89
3Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva1.1757462.98768.9075
4Site clearance, cutting grass, raking into heaps and removing off the premises3959.751.87127.55
5Dag-beling-Single spade stroke minimum 75mm deep35250.31057.5
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)2.12545.55345.55
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal)19.2012925.756176.3657
8False work for R.C.C. and P.C.C. work in plinth and foundation58.675138.78138.2225
9Transportation of metal 3111.5691.98286201.2888
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.423.59345.42146316.4578
11Transportation rates for Hume pipes (NP-3) 1000 mm to 1200 mm dia.5487.182435.9
12Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.53886.819434
13Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making387.2621.68364.816
14Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor3111.5623.171877.036
15Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)423.5940.116985.959
16Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau616.88576.9355878.072
17Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:176.25508.689640.75
18Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti17.8581051875.09
19Cautionary, mandator, informatory, direction and place indentification signs120002000
20Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm)1.39348.2483.998
21Transportion of metal18.21257.84694.538
22Lossening of hard soil by ploughing the existing gound3922.152.710589.805
23Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed3922.1550196107.5
24transportion of sand10.59667.627070.0958
25TRANSPOTATION OF CEMENT4.55194.22883.701
Total Activity 1317000
S.NoMaterialQuantityUnit PriceTotal
11904 transportion rcc hump pip000
22045-compection of hard solder423.5940.116985.959
32048-Construction of gravel ba616.88526.9325034.072
42049-Construction of gravel su176.25458.680828.25
540 mm Metal18.21158528862.85
640 mm metal(1.3.6)000
7BGSY Information Board in Ceme15933.75933.7
8BGSY SIGN BOARD (600X600MM)115001500
9Cement13128537335
10Compaction of Earth Work387.2621.68364.816
11Compaction of Selected soil3111.5623.171877.036
12hard shoulder compaction000
13hard shoulder transportion423.59303.03128360.4777
14HumePipes7.5442133157.5
15Loosening Machine Rent3922.152.710589.805
16signs semi providing 600mm x 4121622162
17signs semi providing 800mm x 6127062706
18Transportation Of Selected Soi3111.5649.59154302.2604
Total Material 908000