S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 5934 | 5934 |
2 | Survey & Investigation | 1.175 | 3074.8 | 3612.89 |
3 | Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva | 1.175 | 7462.9 | 8768.9075 |
4 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3959.75 | 1.8 | 7127.55 |
5 | Dag-beling-Single spade stroke minimum 75mm deep | 3525 | 0.3 | 1057.5 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 2.1 | 2545.5 | 5345.55 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal) | 19.201 | 2925.7 | 56176.3657 |
8 | False work for R.C.C. and P.C.C. work in plinth and foundation | 58.675 | 138.7 | 8138.2225 |
9 | Transportation of metal | 3111.56 | 91.98 | 286201.2888 |
10 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 423.59 | 345.42 | 146316.4578 |
11 | Transportation rates for Hume pipes (NP-3) 1000 mm to 1200 mm dia. | 5 | 487.18 | 2435.9 |
12 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia. | 5 | 3886.8 | 19434 |
13 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 387.26 | 21.6 | 8364.816 |
14 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 3111.56 | 23.1 | 71877.036 |
15 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7) | 423.59 | 40.1 | 16985.959 |
16 | Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau | 616.88 | 576.9 | 355878.072 |
17 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 176.25 | 508.6 | 89640.75 |
18 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti | 17.858 | 105 | 1875.09 |
19 | Cautionary, mandator, informatory, direction and place indentification signs | 1 | 2000 | 2000 |
20 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm) | 1.39 | 348.2 | 483.998 |
21 | Transportion of metal | 18.21 | 257.8 | 4694.538 |
22 | Lossening of hard soil by ploughing the existing gound | 3922.15 | 2.7 | 10589.805 |
23 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 3922.15 | 50 | 196107.5 |
24 | transportion of sand | 10.59 | 667.62 | 7070.0958 |
25 | TRANSPOTATION OF CEMENT | 4.55 | 194.22 | 883.701 |