S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 21.5 | 234 | 5031 |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 27 | 148.33 | 4004.91 |
3 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 12.3 | 185.38 | 2280.174 |
4 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime surkhi mortar 1:1:1 (1lime, 1surkhi, 1sand) | 1.12 | 3911.3 | 4380.656 |
5 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 13.5 | 163.57 | 2208.195 |
6 | Transportation of metal | 9 | 200.12 | 1801.08 |