State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: BADKISARAI(P)
Work Code: 1703004047/DP/22012034580490 (CPW NIRMAAN SHANTIDHAM BADKISARAY)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2023 Work start date : 9/7/2023
Present status : Not Exist Proposed Status : Constr of Water Absorption Trench Trench for Comm
Tech Sanction Details
Technical Sanction No. : 1703004/2023-2024/104173/TS Sanction Date : 16/7/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
202307.24 382749.34 2292.28 85065.15 0 0 0 471000 0 672414.01
Financial Sanction Details
Financial\Administrative Sanction No: 1703004/2023-2024/104173/AS Financial\Administrative Sanction Date 20/7/2023
Fin. Sanc. Amt. (in Rs) NREGA:672414 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
673000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)21.5254408.2457607433294887.49
2Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.23.0631444.4113948749133312.46
3False work for R.C.C. and P.C.C. work in plinth and foundation.82191.19939024390215678.35
4Extra rate for C.R./ R.R./ U.C.R. stone masonry in super structure above plinth level upto floor two level.110.7323.65329719963935828.42
5Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height100107.319110731.91
6(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars5090.38444519.22
7(a) Flush pointing615121.43230894308974680.87
8White washing whith lime on undecorated wall surfaces (two coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter.61512.15305691056917474.13
9(b) 2 coats4.580.2711111111111361.22
10Construction of boulder/stone wall, boulder check etc. as per drawing and specifications in mud mortar or dry, one side of the wall guard walls, temporary diversion etc. including all materials, labour complete215.251479.6331242741318491.03
11(b) Dense or hard soil115.313169.85309548793319586.27
12Collection of approved soil having CBR not less then 5, including stacking at quarry.180210.77211111111137938.98
13Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.18085.688611111111115423.95
Total Activity 669000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper2.21410002214
20297-Stone Aggregate(single size): 10 mm nominal size2.367756501539.0375
30367-Portland Cement7.57065640048452.16
40810-Moorum7.841421801411.4556
50830-Enamel paint0.7425200148.5
60983-Fine sand (zone IV)11.00235102511277.40875
71004-Average rate of mild steel round bars for reinforcements0.385321164002466.05504
81005-Twisted steel/deformed bars0.52569003622.5
91008-Flats up to 10 mm in thickness0.6880733965004472.477035
101215-Welding by electric plant275.22935781275.2293578
113-Display Board / CIB135003500
127335-Binding wire0.56030
13MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT23.06350011531.5
14MR6050-Boulder - quarried, black trap, baysalt or granite (1808B 10%)258.3731188817.3
15MR6073-Lime (Katni)2.469502337
16MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)15.928579012583.515
17MR6091-WOOD-Kail wood 2nd class0.3075180005535
Total Material 301000