Work Code: 1711003017/RC/22012034290708 (NALI AND KHADANJA Mullan jain ke ghar se Kura basor ke ghar ki or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 17/10/2015 Work start date : 30/11/2015
Present status : No Road Proposed Status : Cross Drainage
Tech Sanction Details
Technical Sanction No. : 286/mng Sanction Date : 20/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
856000 500000 0 0 0 0 0 500000 0 1356000
Financial Sanction Details
Financial\Administrative Sanction No: 09/mng Financial\Administrative Sanction Date 21/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:1356000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1356000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Site clearance, cutting grass, raking into heaps and removing off the premises4001.8720
3Contingency12611626116
4Work charge182278227
5Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m72392808
6Filling foundation and around masonry work with moorum I/c ramming layers and watering.80604800
7Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.120607200
8Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)93474.131266.9
9Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)801782142560
10Extra rate for laying cement concrete in or under water or liquid mud including cost of pumping and bailing out and removing slush etc. complete.8089.27136
11Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)1621537.3249042.6
12TRANSPORTATION OF MATERIAL1128258128258
13Hammer dressed 26cm thick stone paving laid in camber with 20mm lime mortar (1:2) bedding and cement pointing in cement mortar 1:3 for roadways.800697.5558000
14Collection of approved soil having CBR not less than 5, including stacking at quarry.8098.37864
15Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite.162509.482522.8
16Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.52.01151.57879.515
17Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil56096.253872
18Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-3 (Size ranging from 53 mm to 22.4 mm)72496.235726.4
Total Activity 1356000
S.NoMaterialQuantityUnit PriceTotal
140 mm Metal7260043200
2Cement657300197100
3First Aid Box1200200
4singboard120002000
5Transportation of Masonry Ston177.05197.5434974.457
6TRANSPORTATION OF STONE208285.559384
7गिटटी 20 mm12.65120015180
8मुरुम परिवहन8050040000
9रेत107.961000107960
Total Material 500000