State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: SAURA
Work Code: 1702001008/RC/329 (R.c. mora goun mohrman singh ke makan se har ke or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 16/8/2011 Work start date : 25/4/2012
Present status : No Road Proposed Status : Earthern road
Tech Sanction Details
Technical Sanction No. : 3802 Sanction Date : 14/9/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
312000 188000 0 0 0 0 0 188000 0 500000
Financial Sanction Details
Financial\Administrative Sanction No: 9/3802 Financial\Administrative Sanction Date 20/9/2011
Fin. Sanc. Amt. (in Rs) NREGA:500000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.45841.46417.6
3Dag-beling-Single spade stroke minimum 75mm deep11460.2229.2
4Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 4089.21520446.05
5Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.297.82118.835381.016
6Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN297.8265.919626.338
7Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making4089.2122.391189.383
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work4089.2167.8277248.438
9Collection of hard moorum including stacking at quarry.297.8294.228054.644
10contingency11800018000
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
1Board125002500
2Compaction of Earth Work4089.2122.391189.383
3compaction of sub grad earthen297.8265.919626.338
4Contengency .11800018000
5Tansportation of water4089.21520446.05
6Transportation charges297.82118.835381.016
Total Material 188000