State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: BHOJAKHEDI
Work Code: 1725006011/WC/22012034445069 (सार्वजनिक पेयजल कूप निर्माण श्मशान कब्रस्थान में भोजाखेड़ी )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2019 Work start date : 7/3/2019
Present status : Non-existent Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 551/JP Sanction Date : 26/2/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
307000 228000 0 0 0 0 0 228000 0 535000
Financial Sanction Details
Financial\Administrative Sanction No: 12/BhoJ. Financial\Administrative Sanction Date 27/2/2019
Fin. Sanc. Amt. (in Rs) NREGA:535000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
535000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m76.75745679.5
2Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)19.07485392546.71
3Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars69158.440354.4
4Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil75.3618614016.96
5Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)177.1944478672.36
6Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m7826853176
7Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m7825240664
8Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 10.5 m initial depth upto 18.0 m1401136159040
9Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)180008000
10work charge14200042000
Total Activity 535000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT14030542700
2Contengenci13500035000
3Convergence Amount12000020000
4Display board115001500
5GITTI16.76140023464
6Sand8.3140011620
7लोहा6915235932
8सम्‍पुर्ण सामाग्री क्रर्य15700057000