Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 07:09:46 PM 
Back  
State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: IMALIYA (P)
Work Code: 1734004008/RC/22012034286483 (सीसी नाली निमार्ण कार्य मुख्यसडक से मा.शालाकी ओर इमालिया(पि.))
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 16/8/2015 Work start date : 12/10/2015
Present status : Cross Drainage Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 81 2015-16 Sanction Date : 20/8/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
75600 47800 0 0 149500 0 0 198000 0 272900
Financial Sanction Details
Financial\Administrative Sanction No: 03 2015-16 Financial\Administrative Sanction Date 25/8/2015
Fin. Sanc. Amt. (in Rs) NREGA:123400 Panchparmeshwar
149500
Scheme 2
0
Scheme 3
0
Total
273000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.179.11.8322.38
2Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.26.865325.78749.9305
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)59.72229.9133125.03
4False work for R.C.C. and P.C.C. work in plinth and foundation162.7477.677705.52
5Transportation of metal 26.87119.73216.339
6Transportation of metal 27.22119.73258.234
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.9.07232.292106.8703
8Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.54.45720.339220.335
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work44.77596.24307.355
Total Activity 273000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL54.451220.366445.335
2CC 1:3:6000
3Cement26029075400
4Centring & Shuttering94.7477.645228.72
5Transportaion of sand (Trip)54.0919010277.1
Total Material 198000