S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 179.1 | 1.8 | 322.38 |
2 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 26.865 | 325.7 | 8749.9305 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 59.7 | 2229.9 | 133125.03 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 162.7 | 477.6 | 77705.52 |
5 | Transportation of metal | 26.87 | 119.7 | 3216.339 |
6 | Transportation of metal | 27.22 | 119.7 | 3258.234 |
7 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 9.07 | 232.29 | 2106.8703 |
8 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms. | 54.45 | 720.3 | 39220.335 |
9 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 44.775 | 96.2 | 4307.355 |