S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 550 | 6.65 | 3657.5 |
2 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 50m And lift upto1.5m-Dense or hard soil | 990 | 74.83 | 74081.7 |
3 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 13.5 | 3829.11 | 51692.985 |
4 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 2003.81 | 2003.81 |
5 | Lossening of hard soil by ploughing the existing gound | 990 | 3.6 | 3564 |