S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 0 | 0 | 0 |
2 | Stage -4 Kapil dhara , construction of para pit & platform & Linking of farm pond with Dug well | 1 | 43000 | 43000 |
3 | Heating binder upto required temperature including fuel for heating | 1 | 47000 | 47000 |
4 | Heating binder upto required temperature excluding fuel for heating | 1 | 60000 | 60000 |
5 | Labour only for applying evenly a priming/ tack coat with the bituminous primer(bitumen 80/100) @ 10kg./10 sqm on WBM surface. | 1 | 50000 | 50000 |