Work Code: 1725001027/DW/9993633362 (PAYJAL KOOP NIRMAL NIR - KABRASTAN)
Work Category: Drinking Water
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 6/3/2014
Present status : Not Exist Proposed Status : DUGWELLS
Tech Sanction Details
Technical Sanction No. : 680/12 Sanction Date : 26/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
216000 144000 0 0 0 0 0 144000 0 360000
Financial Sanction Details
Financial\Administrative Sanction No: 25/12 Financial\Administrative Sanction Date 27/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:360000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
360000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)244.1790.121999.717
2Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)1235720.224714.4
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m67.1235.82402.896
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)4.713177.814967.438
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)8.34341828506.12
6False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift151.24199.730202.628
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars32065.921088
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil17.0190.11532.601
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum39.7117.14648.87
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)85.05283.6924127.8345
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.294.99570.15168188.5485
12work charge11749517495
Total Activity 360000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL119009900
2blasting30010030000
3Cement(bori)8530025500
4Centering and Shuttering14015021000
5CONTANGANCY120002000
6desal pump rent1685013600
7Display board120002000
8MASON (PERDAY)203507000
9Photo copy110001000
10Sand6.511007150
11STEEL3206520800
12TRAINSPORT CHARGE140004000
Total Material 144000