S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 11862 | 11862 |
3 | Work charge | 1 | 16709 | 16709 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 238.22 | 23.9 | 5693.458 |
5 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 20.47 | 3698.39 | 75706.0433 |
6 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 437.09 | 250.5 | 109491.045 |
7 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 791.43 | 56.2 | 44478.366 |
8 | TRANSPORTATION OF MATERIAL | 1 | 22469 | 22469 |
9 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 23.84 | 98.1 | 2338.704 |
10 | Earth work for well excavation-Hard moorum lift from 1.5 m. to 2.00 m. | 7.94 | 105.9 | 840.846 |
11 | Earth work for well excavation-Hard moorum lift from 2.00 m. to 2.50 m. | 7.94 | 143.1 | 1136.214 |
12 | Earth work for well excavation-Hard moorum lift from 2.50 m. to 3.00 m. | 7.94 | 150.9 | 1198.146 |
13 | Earth work for well excavation-Hard moorum lift from 3.00 m. to 3.50 m. | 7.94 | 158.7 | 1260.078 |
14 | Earth work for well excavation-Hard moorum lift from 3.50 m. to 4.00 m. | 7.94 | 166.5 | 1322.01 |
15 | Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m. | 7.94 | 174.3 | 1383.942 |
16 | Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m. | 7.94 | 182.1 | 1445.874 |
17 | Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m. | 7.94 | 189.9 | 1507.806 |
18 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 5.50 m. to 6.00 m. | 7.94 | 467.4 | 3711.156 |
19 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.00 m. to 6.50 m. | 7.94 | 484.32 | 3845.5008 |
20 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.50 m. to 7.00 m. | 7.94 | 501.24 | 3979.8456 |
21 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.00 m. to 7.50 m. | 7.94 | 518.16 | 4114.1904 |
22 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.50m. to 8.00 m. | 7.94 | 535.08 | 4248.5352 |
23 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.00 m. to 8.50 m. | 7.94 | 552 | 4382.88 |
24 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.50 m. to 11.00 m. | 7.94 | 641.28 | 5091.7632 |
25 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.50 m. to 9.00 m. | 7.94 | 568.92 | 4517.2248 |
26 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 9.00 m. to 9.50 m. | 7.94 | 585.84 | 4651.5696 |
27 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 9.50 m. to 10.00 m. | 7.94 | 602.76 | 4785.9144 |
28 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.00 m. to 10.50 m. | 7.94 | 619.68 | 4920.2592 |
29 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.00 m. to 11.50 m. | 7.94 | 662.88 | 5263.2672 |
30 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.50 m. to 12.00 m. | 7.94 | 684.48 | 5434.7712 |
31 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.00 m. to 12.50 m. | 7.94 | 706.08 | 5606.2752 |
32 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m. | 7.94 | 727.68 | 5777.7792 |
33 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.00 m. to 13.50 m | 7.94 | 749.28 | 5949.2832 |
34 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.50 m. to 14.00 m. | 7.94 | 770.88 | 6120.7872 |
35 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.00 m. to 14.50 m. | 7.94 | 792.48 | 6292.2912 |
36 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.50 m. to 15.00 m. | 7.94 | 814.08 | 6463.7952 |
37 | Earth work for well excavation-Hard rock requiring blasting lift from 14.00 m. to 14.50 m. | 0 | 0 | 0 |