Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 25-Jun-2024 10:57:21 AM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SYAU(P)
Work Code: 1703004084/RC/22012034295121 (Kharanja Nirman Shishpal parmar ke makan se Pathar baba ki or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 17/11/2015 Work start date : 30/12/2015
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 84/4278 Sanction Date : 14/12/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
90680 42269 0 0 0 0 0 42300 0 132949
Financial Sanction Details
Financial\Administrative Sanction No: 84/29 Financial\Administrative Sanction Date 20/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:132949 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
133000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard150005000
2Contingency11000010000
3Dag-beling-Single spade stroke minimum 75mm deep2000.360
4Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.300226.167830
5Transportation rates for Masonry stone.42.75405.317326.575
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.811239963
7Loading of metal in truck, dumper etc.8128.262289.06
8Unloading of metal in truck, dumper etc.8114.131144.53
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.70.544.13109.05
10Collection of hard moorum including stacking at quarry.81140.711396.7
11Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.35013.84830
Total Activity 133000
S.NoMaterialQuantityUnit PriceTotal
1contangency11000010000
2Display board150005000
3खण्‍डा परिवहन42.75405.317326.575
4मुरम परिवहन (1)811239963
Total Material 42300