S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Loose or soft soil | 255 | 512 | 130560 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 25 | 515.15 | 12878.75 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 18 | 315 | 5670 |
4 | Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like. | 47 | 174 | 8178 |
5 | Providing and laying five courses damp proofing treatment sumps, reservoirs, roof etc. consisting of 1st. 3rd and 5th courses of blown type petroleum bitumen of I. S. grade 85/25 applied @1.6kg/sqm and 2nd and 4th courses of self finished bitumen felt typ | 69 | 256 | 17664 |
6 | Deduct from item no 0413 if 63mm graded metal used in place of 40mm metal | 335 | 356 | 119260 |
7 | Labour only for item no. 0437 | 72 | 172 | 12384 |
8 | Stone shelves fixed in walls in cement mortar 1:3 (1cement, 3sand) I/c finishing complete.-50 mm thick | 75 | 365 | 27375 |
9 | Extra rate for laying stone work in or under water and or liquid mud including cost of pumping or bailing out water and removing slush etc, complete etc.(For every 0.3 meter depth) | 190 | 566 | 107540 |
10 | Extra for making cheques of approved pattern on cement concrete floors, steps, landing, pavement etc. | 1 | 500 | 500 |