S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Single spade stroke minimum 75mm deep | 809 | 0.38274412855377 | 309.64 |
2 | Filling foundation, around masonry work, plinth, sides of foundation etc. with moorum I/c ramming layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m. | 2.88 | 274.354166666667 | 790.14 |
3 | (a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 2 | 3823.54 | 7647.08 |
4 | (c) C.C. 1:4:8 (1cement, 4sand, 8metal) | 2.36 | 2832.1186440678 | 6683.8 |
5 | Brick bat filling in trenches or soak pits. | 0.57 | 296.315789473684 | 168.9 |
6 | (k) Cement mortar 1:8 (1cement, 8sand) | 4.09 | 3766.28361858191 | 15404.1 |
7 | (b) In cement mortar 1:4 | 12.5 | 530.2952 | 6628.69 |
8 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 20 | 86.068 | 1721.36 |
9 | (d) Cement mortar 1:6 (1cement, 6sand) | 38.2 | 101.739005235602 | 3886.43 |
10 | Providing 6mm thick corrugated asbestos cement sheets roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm dia. G.I. plain and bitumen washer complete excluding the cost of purlines rafters and trusses. | 2.73 | 316.512820512821 | 864.08 |
11 | (a) 40 mm thick. | 0.81 | 251.703703703704 | 203.88 |
12 | Colour washing 2 coats over and including a primary coat of white washing on undecorated wall surface. | 38.2 | 16.853664921466 | 643.81 |
13 | (I) 0.5 Km. Lead -- | 828.1 | 89.9293563579278 | 74470.5 |
14 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complete compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete. | 2328.1 | 24.0567716163395 | 56006.57 |
15 | (b) Dense or hard soil | 5.59 | 148.359570661896 | 829.33 |
16 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 2783.73 | 3.60017314897637 | 10021.91 |
17 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 2783.73 | 74.8319987929864 | 208312.08 |
18 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3613.85 | 3613.85 |