Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:08:26 PM 
Back  
State: MADHYA PRADESH District: HARDA Block: HARDA Panchayat: DAGAWANSHANKAR
Work Code: 1743002026/IF/22012034844778 (SLWM अंतर्गत ग्राम घोंघाड़ा माफी में व्यक्तिगत सोख्ता गड्ढा निर्माण कार्य)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 17/8/2021 Work start date : 25/8/2021
Present status : Not Exist Proposed Status : Construction of Soak Pit for Individual
Tech Sanction Details
Technical Sanction No. : 1743002/2021-2022/440608/TS Sanction Date : 8/9/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
3049.54 9696.42 471.75 721.36 0 0 0 10900 0 13939.07
Financial Sanction Details
Financial\Administrative Sanction No: 1743002/2021-2022/440608/AS Financial\Administrative Sanction Date 9/9/2021
Fin. Sanc. Amt. (in Rs) NREGA:13939 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
14000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m3.4658.4508670520231202.24
2(a) C.C. 1:2:4 (1cement, 2sand, 4metal)0.23829.1765.82
3(c) 50 mm thick2355.33710.66
4(j) Cement mortar 1:6 (1cement, 6sand)1.663920.692771084346508.35
5(d) Cement mortar 1:6 (1cement, 6sand)10.24141.5566406251449.54
6(h) 4.0 Km. Lead1.73159.566473988439276.05
7(V) 2.5 Km. Lead1.73151.705202312139262.45
8Providing and fixing on wall face unplasticised Rigid PVC Rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. (ii) 110 mm diameter (minimum wall thickness 2.2mm)10232.2012322.01
9(b) Dense or hard soil5.66148.227915194346838.97
10Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.1.73163.375722543353282.64
11Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.1.73185.161849710983320.33
Total Activity 14000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.04717688541.75076
20084-Hire charges of Diesel truck - 9 tonne (without POL)0.126487752242283.5855355
30297-Stone Aggregate(single size): 10 mm nominal size0.02263013.86
40367-Portland Cement0.2018855111112.56068
50983-Fine sand (zone IV)0.67156641076.25722.773338
61174-Red sand stone slab 45 mm to 50 mm thick (un-dressed)2.2180.86397.892
71235-Diesel oil1.102007226874.93649096
85001-Mobil oil0.03912734182.97.156390486
97900-Modular common burnt clay bricks of class designation 7.5865.284.133573.6064
10MR11640-uPVC Pipe (Working Pressure 4kg/cm square) single socketed pipe 110mm dia101601600
11MR11641-uPVC Pipe (Working Pressure 4kg/cm square) rubber (seal) ring 100mm dia1.666666672541.66666675
12MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.10452554.6
13MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.04468230.008
Total Material 8000