S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 15750.5 | 0.2 | 3150.1 |
2 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 1399.36 | 105.3 | 147352.608 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 2309 | 81.2 | 187490.8 |