S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Lime Surkhi Mortar 1:1:2 ( 1 lime putty, 1 surkhi, 2sand ) | 0 | 0 | 0 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 27 | 224 | 6048 |
3 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 45 | 87.48 | 3936.6 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 30 | 2478.2 | 74346 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal) | 0 | 0 | 0 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 300 | 154.2 | 46260 |
7 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 14.04 | 330.8 | 4644.432 |
8 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 13.2 | 112.8 | 1488.96 |
9 | Transportation of metal | 13.5 | 161.5 | 2180.25 |
10 | Transportation of metal | 12.75 | 161.5 | 2059.125 |
11 | Transportation of metal | 13.2 | 193.15 | 2549.58 |
12 | Transportation of metal | 300 | 119.6 | 35880 |
13 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 300 | 23.6 | 7080 |
14 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 300 | 57.7 | 17310 |
15 | Site clearance, cutting grass, raking into heaps and removing off the premises | 4.5 | 81.2 | 365.4 |
16 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 296 | 97.7 | 28919.2 |
17 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 13.5 | 97.7 | 1318.95 |
18 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 300 | 118.8 | 35640 |
19 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil. | 1000 | 12.8 | 12800 |
20 | work charge | 90 | 100 | 9000 |