Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:27:45 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: KORATA
Work Code: 1711006051/RC/22012034538409 (sudur sadak nirman/kher mata se pipri bare and lokman ke khet se chhote lal ke khet ki or/korta)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 7/6/2020 Work start date : 11/9/2020
Present status : No Road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 1711006/2020-2021/411077/TS Sanction Date : 21/11/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
397536.42 1086498.39 951.56 11330.84 0 0 0 1099000 0 1496317.21
Financial Sanction Details
Financial\Administrative Sanction No: 1711006/2020-2021/411077/AS Financial\Administrative Sanction Date 21/11/2020
Fin. Sanc. Amt. (in Rs) NREGA:1496609 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1497000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.62256.5419469879518140723.62
2Single spade stroke minimum 75mm deep24900.376799196787149938.23
3(I) Lead upto 100 Metres1918.336.219814419016869480.47
4Filling foundation, around masonry work, plinth, sides of foundation etc. with moorum I/c ramming layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m.76.7273.44615384615420973.32
5(a) C.C. 1:2:4 (1cement, 2sand, 4metal)6.423813.24610591924481.04
6(b) C.C. 1:3:6 (1cement, 3sand, 6metal)13.323162.4114114114142123.32
7(f) C.C 1:2.5:5 ( 1cement, 2.5 sand, 5metal)23.613501.2439644218682664.37
8Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column93.01160.51800881625614929.78
9False work for R.C.C. and P.C.C. work in plinth and foundation.52.41168.369776760168824.26
10(XV) 10 Km. Lead11.99233.046705587992794.23
11(XXXI) 70 Km. Lead26.28712.50570776255718724.65
12(XXVIII) 45 Km. Lead15738.23466666666711073.52
13(X) 5.0 Km. Lead7.58152.1121372031661153.01
14(II) 1.0 Km. Lead76.796.80378096479797424.85
15(XXIX) 50 Km. Lead19.24510.541060291069822.81
16(b) 1000 mm dia.153762.6673333333356440.01
17Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete.3412.317.350089382527959203.71
18Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complete compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete.1225.723.9425879089529346.43
19Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7), i/c all leads and lifts of materials etc. complete.359.81291.782579694839104986.29
20(a) Above item having material strength not less than 80% CBR859.05613.203166288342526772.18
21"Construction of Gravel Surface Course as per clause 402 of "Ministry of Rural Development, Specifications for Rural Roads-August, 2004" by an appropriate combination of natural gravel, river borne material and crushed metal in required proportions confirming to Grading requirements specified in clause 2.2.2.2 or clause 2.2.2.3 (Table 2.3, Material having Nominal Maximum Size 20 mm or 10 mm) of IRC:SP:77-2008, having Liquid Limit less than 40 and Plasticity Index 6-15 and strength of material not less than 20% CBR, including all leads and lifts of material etc. complete. The mixing shall be by Mix-in-Place method over prepared surface, spreading in uniform layers with tractor mounted grader or manually, watering at OMC and compaction by smooth wheeled/vibratory roller of 80 to 100 kN static weight to achieve 100% of MDD as per IS:2720 (Part-7)".186.75468.35207496653387464.75
22b (i) Dense or hard soil for Road Work1918.3134.187217849137257411.34
23(c) Dense or hard soil (PT/30/30)46.83197.8076019645539263.33
24Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.1662.083.600169666923375983.77
25Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13603.483603.48
Total Activity 1497000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper4.34418853844.5285
20038-Tractor with ripper attachment13.3821212428423.5804
30055-Smooth Wheeled Roller 8 to 10 tonne171.957423640581.9464
40057-Water Tanker 5 to 6 KL Capacity116.186711813710.0306
50084-Hire charges of Diesel truck - 9 tonne (without POL)3.411422427648.3588
60295-Stone Aggregate(single size):20 mm nominal size309.258797.44246614.69952
70296-Stone Aggregate(single size): 12.5 mm nominal size42.9525797.4434252.0416
80297-Stone Aggregate(single size): 10 mm nominal size3.30256302080.575
90367-Portland Cement11.7761551164898.0871
100368-White cement 0.0004157446.2976
110763-Glue 2.4757.9519.67625
120810-Moorum76.718914496.3
130983-Fine sand (zone IV)19.95181076.2521473.12475
141235-Diesel oil42.4324682885.4032
155001-Mobil oil1.5142182.9276.94718
167900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
17MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT24.333752512775.1925
18MR6032-Snowcem/ durocem0.00072778919.4523
19MR6039-Water697120.380.0534856.019
20MR6045-RCC NP-3 pipe 1000mm(based on LUN rate)152977.7844666.7
21MR6046-RCC NP-3 collar 1000mm(based on LUN rate)4.5266.671200.015
22MR6051-Tractor with rotavator7.472101568.7
23MR6052-Hard moorum603.576189114075.864
24MR6056-Well Graded granular material (For Gravel Road)721.602246.19177651.19638
25MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)9.82546826700.9228
26MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver7.47937085295.3444
27MR6091-WOOD-Kail wood 2nd class0.528715825.68366.99472
Total Material 890000