State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: UMARDA
Work Code: 1725007077/WC/22012034393888 (Pokhar talab Umarda)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 20/6/2018
Present status : Non-existent Proposed Status : Constr of Brushwood Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 64/18-19 Sanction Date : 1/5/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
700000 252000 0 0 0 0 0 252000 0 952000
Financial Sanction Details
Financial\Administrative Sanction No: 000001/18-19 Financial\Administrative Sanction Date 19/5/2018
Fin. Sanc. Amt. (in Rs) NREGA:952000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
952000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil711710.776151.9
222cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.01413026033800
3Surface dressing two coats with paving bitumen using 18kg. of bitumen 80/100 per 10sqm with 0.15cum of stone chipping 13.2mm nominal size per 10sqm for 1st coat and 11kg. of bitumen 80/100 per 10sqm with 0.10cum of stone chipping 11.2mm nominal size per 115726057260
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.1488750744350
5Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum148872.740194.9
Total Activity 952000
S.NoMaterialQuantityUnit PriceTotal
1transportion50.45000252000
Total Material 252000