State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: MALGAON
Work Code: 1725006033/IF/18 (कपिलधारा कूप सह मेढबंधान कार्य अनुबाई भाईराम (मलगा)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/2/2012 Work start date : 22/2/2012
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 0001013 Sanction Date : 22/2/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
98600 51400 0 0 0 0 0 51400 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: ma14 Financial\Administrative Sanction Date 22/2/2012
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)000
2Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)8.2972557.621220.4072
3False work for R.C.C. and P.C.C. work in plinth and foundation178.5128.622955.1
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand)000
5Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars200.251.710350.34
6Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil22.6775.31707.051
7Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum44.3497.84336.452
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)68.01239.516288.395
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.112.8404.5945637.752
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)46.87586.827503.316
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL7.068506001
2BULLOCK CART04000
3Cement48.3330014499
4Centering and Shuttering108.18889519.84
5Contagecny3.215001605
6Display board115001500
7hol1437010010
8IRON SARIYA88.3661.35416.468
9Mason Payment (Semi Skilled)03500
10Roller000
11Sand5.347504005
12TRAINSPORT CHARGE1269269
13Transportation charges111
14पानी टेकर000
Total Material 52900