S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 30 cm and not exceeding 100 cm | 6586.13 | 2.7 | 17782.551 |
2 | Labour only for Cement Mortar | 294 | 167 | 49098 |
3 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 5960.63 | 10.7 | 63778.741 |
4 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 208.5 | 260.4 | 54293.4 |
5 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 6586.1 | 50 | 329305 |
6 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work | 5960.63 | 2.7 | 16093.701 |
7 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti | 5960.63 | 50 | 298031.5 |