State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: SAKRAYA
Work Code: 1702001037/RC/22012034343300 (sudur sampark sadak phoop surpura main road se sakaraya ki or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 29/4/2017 Work start date : 28/6/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1514/1037 Sanction Date : 2/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
532200 354800 0 0 0 0 0 355000 0 887000
Financial Sanction Details
Financial\Administrative Sanction No: 04/1037 Financial\Administrative Sanction Date 31/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:887000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
887000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises10000330000
2Transportation of metal 2976.5192.16274315.1616
3Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making130518.424012
4Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact2976.5124.773519.797
5Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp100201.6420164
6Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau525576.9302872.5
7Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:16150080500
8Site clearance, cutting grass, raking into heaps and removing off the premises15933.75933.7
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work17462.97462.9
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work13074.83074.8
11Excavating post holes (or similar holes) upto 0.5cum including getting out the excavated soil, than returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc., disposing of-Dense or hard soil.16.3322252518.6
12Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil511355675
13Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum63402040
14Collection of soft moorum including stacking at quarry.202304600
Total Activity 887000
S.NoMaterialQuantityUnit PriceTotal
12043 soil Compaction material1282.592.16118195.2
22048-Construction of gravel ba172.8288.4549844.16
3Compaction of Earth Work8535530175
4Compaction of Selected soil103092.1694924.8
5sub grade transportion664.1292.1661205.2992
Total Material 355000