S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1800 | 6.4 | 11520 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 978 | 68.75 | 67237.5 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 126 | 264.7 | 33352.2 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 52.64 | 2604.7 | 137111.408 |
5 | Labour only for item no. 0413 (for any proportion of cement concrete) | 168.31 | 3307.14 | 556624.7334 |
6 | Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size. | 9 | 1821.2 | 16390.8 |
7 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 379.62 | 147.8 | 56107.836 |
8 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 20 | 198 | 3960 |
9 | Loading of metal in truck, dumper etc. | 110 | 98.6 | 10846 |
10 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 53 | 44.7 | 2369.1 |
11 | Collection of hard moorum including stacking at quarry. | 53 | 142.5 | 7552.5 |
12 | contingency | 1 | 37862.9226 | 37862.9226 |