State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KADHURA
Work Code: 1702001047/RC/22012034292852 (Graval road from Muktidham to Jaynarayan house)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 2/10/2015 Work start date : 15/12/2015
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 2239c Sanction Date : 8/12/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
868000 539000 0 0 0 0 0 539000 0 1407000
Financial Sanction Details
Financial\Administrative Sanction No: 3/2239 Financial\Administrative Sanction Date 8/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:1407000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1407000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.90004.439600
3Chain and compass survey.-Canals/Roads1636636
4Fly levelling for fixing temporary bench marks.-Above 15 m interval1477477
5Levelling - Headwork.-Below 5 m interval115901590
6Levelling - Headwork.-Above 15 m interval1508.8508.8
7Stacking and boxing.-Moorum or sand600159000
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1575000575000
9Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN6007142600
10Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.154246.763700.5
11Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making2394.7531.274716.2
12Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor298732.797674.9
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work11462.71462.7
14Collection of hard moorum including stacking at quarry.600142.585500
15R C C Pole Fixing only60087.752620
16contingency1359000359000
Total Activity 1407000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work2394.7531.274716.2
2Compaction of GSB6007142600
3Compaction of Selected soil298732.797674.9
4Convergence Amount13000030000
5hume pipe15410061500
6Kilometre Stone (200 M)43341336
7Kilometre Stone (ordinary)26871374
8Transpotation Charges1229000229000
Total Material 539000