State: MADHYA PRADESH District: MANDSAUR Block: BHANPURA Panchayat: PARONYA
Work Code: 1716001028/RC/22012034338467 (SUDUR KHET SADAK NIRMAN_Gram Paroniya_ Talab ke Pas se Rodilal Meena Ke khet tak)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2017 Work start date : 18/5/2017
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 04/1028/17-18/AE Sanction Date : 17/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
513000 468000 0 0 0 0 0 468000 0 981000
Financial Sanction Details
Financial\Administrative Sanction No: 12/1028/17-18/S Financial\Administrative Sanction Date 18/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:981000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
981000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.29251.44095
2Chain and compass survey.-Canals/Roads1.3636826.8
3Levelling - Headwork.-Below 5 m interval1.315902067
4Levelling - Headwork.-Above 15 m interval1.3508.8661.44
5Stacking without boxing.-Puddle earth, moorum, sand or kankar1829.6111.521040.515
6Transportation of metal 1829.6191.17166805.5437
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.2609.6144.7116649.567
8Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia20315.46308
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making67631.521294
10Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor172933.257402.8
11Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:234388.490885.6
12Site clearance, cutting grass, raking into heaps and removing off the premises120002000
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work3355.9588.4296665.98
14Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil53341670
15Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil36872061
16Collection of hard moorum including stacking at quarry.234142.533345
17Rolling & Compaction of granule sub-base of well graded-material Spreading in unformed layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC and compacting with Smooth wheel rollers of 80 to 100 KN static weight to achieve the desired density, complete as pet Technical Specification Clause 401 of Specification for Rural Roads i/c all leads of water etc, complete.78065.551090
18Setting out work (Reference pillars referencing bench mark and temporary bench mark):Painting/Marking of Reference/Working Bench Mark over existing permanent structure Fixing of Reference pegs made of local rough wood for making centre line and toe lines. Fixing of reference poles made of bamboos or jungle wood bellies etc.12458.51.316196.05
19Field Technical Supervisior Charge-FTSC18900089000
Total Activity 981000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work67631.521294
2contangency and work charges115001500
3FTSC-Field Technical supervisi120002000
4Hard Moorum Transportation1839.6191.17167717.2437
5hume pipe20315.46308
6Kilometre Stone (200 M)53341670
7Kilometre Stone (ordinary)36872061
8PhotoCopy & Stationary1500500
9Rolling234388.490885.6
10Rolling Earth & moorum78065.551090
11sub grade watring172933.257402.8
12Transportanion of hard Muram234110.1625777.44
13Transportation Of Material234134.3731442.58
14WATER TENKAR155007500
15गिटी 20 mm0.251000250
Total Material 468000