S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1700 | 7.60931764705882 | 12935.84 |
2 | Providing stone chips under stone pitching | 380 | 612.636289473684 | 232801.79 |
3 | (a) Other then black trap Basalt or granite | 83.6 | 367.086124401914 | 30688.4 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 2566.687 | 2.73487573669871 | 7019.57 |
5 | (I) 0.5 Km. Lead | 83.6 | 145.180023923445 | 12137.05 |
6 | (II) 1.0 Km. Lead | 987.187 | 102.08647399125 | 100778.44 |
7 | (IV) 2.0 Km. Lead | 1579.5 | 119.291693573916 | 188421.23 |
8 | (a) Boulders | 150 | 927.3486 | 139102.29 |
9 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 136.687 | 490.630637880706 | 67062.83 |
10 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 2566.687 | 23.1489698588102 | 59416.16 |
11 | b (iii) Dense or hard soil for Tank Work | 889.875 | 156.081247366203 | 138892.8 |
12 | c (iii) Hard moorum for Tank Work | 1615.5 | 207.90022903126 | 335862.82 |
13 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 30.375 | 659.777777777778 | 20040.75 |
14 | b (i) Hard rock requiring blasting for Tank Work | 210 | 688.422 | 144568.62 |