Work Code: 1725007038/IF/155 (कपिल धारा कुप निर्माण मेढ बंधान /रूखडु मल्‍लु/जामल)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 20/4/2011 Work start date : 27/4/2011
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 55a- Sanction Date : 27/4/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
90000 60000 0 0 0 0 0 60000 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: 06a- Financial\Administrative Sanction Date 2/5/2011
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil37.367.82528.94
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum37.386.63230.18
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)65.9381.885398.3484
4Dag-beling-Single spade stroke minimum 75mm deep6000.2120
5Labour only for item no.0402195.39305861.7
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.352557.616240.76
7False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift96.52155.915047.468
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars199.395210368.28
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil38.1575.32872.695
10Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum57.2297.85596.116
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)31.31221.76941.427
12Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.158.62393.762448.694
131902 Transportion of metal12525.252525.25
14work charge11081810818
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
110 M.M. STEEL000
220 M.M. METAL231006200
3Blasting (No)1808014400
4Cement4130012300
5Centering and Shuttering187008700
6desal pump rent450104500
7IRON SARIYA199.395210368.28
8Mason Payment (Semi Skilled)42501000
9Photocopy & staionary000
10PhotoCopy & Stationary1003300
11Photograph1020200
12RR stone (Granite)1100100
13Sand120002000
Total Material 60100