S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 400000 | 400000 |
3 | Work charge | 1 | 348790 | 348790 |
4 | Collection of approved soil having CBR not less than 5, including stacking at quarry. | 2760 | 184.07 | 508033.2 |
5 | Transportation of metal | 876.78 | 102.09 | 89510.4702 |
6 | Transportation of metal | 3416.25 | 136.19 | 465259.0875 |
7 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 300 | 129.68 | 38904 |
8 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1753.55 | 17.37 | 30459.1635 |
9 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 2760 | 24.06 | 66405.6 |
10 | Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp | 300 | 292.53 | 87759 |
11 | Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau | 656.25 | 548.57 | 359999.0625 |
12 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1.25 | 6839.46 | 8549.325 |
13 | Lossening of hard soil by ploughing the existing gound | 1753.55 | 3.61 | 6330.3155 |