Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:20:54 PM 
Back  
State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: JHIRIYA
Work Code: 1713003056/IF/22012034634726 (कपिलधारा कूप राजकुमार द्विवेदी)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2020 Work start date : 26/11/2020
Present status : Not Exist Proposed Status : Constr of Sand filter-openwell recharge for Indiv
Tech Sanction Details
Technical Sanction No. : 1713003/2020-2021/453659/TS Sanction Date : 13/12/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
113435.72 84035.16 58341.49 8042.87 0 0 0 151000 0 263855.24
Financial Sanction Details
Financial\Administrative Sanction No: 1713003/2020-2021/453659/AS Financial\Administrative Sanction Date 15/12/2020
Fin. Sanc. Amt. (in Rs) NREGA:264021 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
265000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m53.3657.60813343328343073.97
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)2.353161.540425531917429.62
3Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)0.293961.724137931031148.9
4(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)3.15287.6258064516116391.64
5Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column5.07160.552268244576814
6(e) In Cement mortar 1:6 (1cement, 6sand)20.122835.7410536779357055.11
7(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars90.572.00861878453046516.78
8(j) 5.0 Km. Lead6.88174.0595930232561197.53
9(IV) 2.0 Km. Lead23.34172.9417309340194036.46
10(X) 5.0 Km. Lead9194.3666666666671749.3
11(X) 5.0 Km. Lead9152.1133333333331369.02
12(XV) 10 Km. Lead12.23209.7424366312352565.15
13(XV) 10 Km. Lead0.1201.420.14
14(b) Dense or hard soil60.24148.7749003984068962.2
15(I)1.50 m. to 2.00 m.20.18201.5891972249754068.07
16(II)2.00 m. to 2.50 m.20.18211.6580773042624271.26
17(XVIII)10.00 m. to 10.50 m.7.26764.680440771355551.58
18(XIX)10.50 m. to 11.00 m.7.26787.9641873278245720.62
19(XX)11.00 m. to 11.50 m.6.92812.0534682080925619.41
20(XXI)11.50 m. to 12.00 m.6.92835.3612716763015780.7
21(III)2.50 m. to 3.00 m.20.18511.75123885034710327.14
22(X)6.00 m. to 6.50 m.8.67853.587081891587400.6
23(XI)6.50 m. to 7.00 m.8.67871.7520184544417558.09
24(XII)7.00 m. to 7.50 m.8.31889.3802647412757390.75
25(XIII)7.50 m. to 8.00 m.8.31907.5330926594467541.6
26(XIV)8.00 m. to 8.50 m.7.95926.0100628930827361.78
27(XV)8.50 m. to 9.00 m.7.95944.1698113207557506.15
28(XVI)9.00 m. to 9.50 m.7.6962.4447368421057314.58
29(XVII)9.50 m. to 10.00 m.7.6980.6065789473687452.61
30(IV)3.00 m. to 3.50 m.9.81760.8909276248737464.34
31(V)3.50 m. to 4.00 m.9.81775.8491335372077611.08
32(VI)4.00 m. to 4.50 m.9.42790.9002123142257450.28
33(VII)4.50 m. to 5.00 m.9.42805.8598726114657591.2
34(VIII)5.00 m. to 5.50 m.9.04820.7433628318597419.52
35(IX)5.50 m. to 6.00 m.9.04835.7013274336287554.74
36Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9161.0255555555561449.23
37Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9224.5766666666672021.19
38Citizen Information Board of size 0.6 meter x 0.9 meter ( Individual works )12264.332264.33
Total Activity 265000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.1053885978.1905
20084-Hire charges of Diesel truck - 9 tonne (without POL)1.984722424449.6974
30297-Stone Aggregate(single size): 10 mm nominal size0.7141630449.883
40325-Blasting powder36.311552.491905.990635
50326-Blasting fuse (fuse wire)39.59214.51574.47992
60367-Portland Cement3.497551119271.967
70368-White cement 0.0002157443.1488
80982-Coarse sand (zone III)0.89831028.16923.596128
90983-Fine sand (zone IV)9.77211076.2510517.222625
101005-Twisted steel/deformed bars0.950254285157.6856
111157-Stone for masonry work23.3369519.7512129.353775
121235-Diesel oil17.7458681206.7144
135001-Mobil oil0.6321182.9115.61109
147335-Binding wire0.90555.5850.2999
157900-Modular common burnt clay bricks of class designation 7.5150.84.13622.804
16MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT2.82115251481.0775
17MR6007-Hier Charges for Centering3.0998002479.2
18MR6032-Snowcem/ durocem0.00042778911.1156
19MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)3.33556822274.811
20MR6091-WOOD-Kail wood 2nd class0.018115825.6286.44336
Total Material 64900