State: MADHYA PRADESH District: KHARGONE Block: BHAGVANPURA Panchayat: AMLYAPANI
Work Code: 1724008003/WC/22012034940790 (AMRIT SAROVAR ANARSINGH KE KHAT PAS)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 5/4/2022 Work start date : 11/4/2022
Present status : Non-existent Proposed Status : Construction of Mini Percolation Tank for Comm
Tech Sanction Details
Technical Sanction No. : 1724008/2022-2023/61197/TS Sanction Date : 9/4/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1476234.47 839094.12 83.08 64890.53 0 0 0 905000 0 2380302.2
Financial Sanction Details
Financial\Administrative Sanction No: 1724008/2022-2023/61197/AS Financial\Administrative Sanction Date 9/4/2022
Fin. Sanc. Amt. (in Rs) NREGA:2380302 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
2381000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(b) C.C. 1:3:6 (1cement, 3sand, 6metal)3.5283202.6332199546511298.89
222cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.588215.942993197279126974.48
3(a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work)3894.8682.524498904712569832.59
4(X) 5.0 Km. Lead382.2241.71619570905392383.93
5(IV) 2.0 Km. Lead205.8177.0497084548136436.83
6(VIII) 4.0 Km. Lead272142.00187538624.51
7(IX) 4.5 Km. Lead3540.789148.738555163835526651.84
8(a) Boulders479.22598.843495680481286977.78
9For earthen dam - puddle filling of good clay ( excluding cost of puddle earth & Water) including mixing, kneading by tamping , ramming & laying etc.340259.33588173.9
10(a) Loose or soft soil for Tank Work, lift of up to 3m depth26594.45225029.78
11Hearting, casing/cut off filling soil etc. At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete.3894.86821.934165676474885430.68
12a (iii) Loose or soft soil for Tank Work44.028106.7309439447624699.15
13b (iii) Dense or hard soil for Tank Work2113.403144.075001313048304488.54
14c (iii) Hard moorum for Tank Work3873.19191.90790020629743295.76
Total Activity 2381000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.3528885312.228
20038-Tractor with ripper attachment4.868585212410340.87454
30054-Vibratory roller 8 to 10 tonne27.848306294426288.8010528
40057-Water Tanker 5 to 6 KL Capacity77.897361189191.88848
50084-Hire charges of Diesel truck - 9 tonne (without POL)157.302010452242352671.1074289
60367-Portland Cement0.7761655114277.41776
70983-Fine sand (zone IV)1.658161076.251784.5947
81235-Diesel oil1674.0313412468113834.13120432
95001-Mobil oil60.07110254182.910987.004654566
107753-Boulder 50 mm to 200 mm176.414725930.8
11MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT2.29325251203.93
12MR6039-Water389486.80.0519474.34
13MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.84672682577.46304
14MR6101-Boulder - picked up (1807)479.2214770445.34
Total Material 648000