S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 250 cm and not exceeding 300 cm | 1 | 1500 | 1500 |
2 | Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works) | 25 | 253 | 6325 |
3 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Hard rock requiring blasting | 652 | 159 | 103668 |
4 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 1 | 50000 | 50000 |
5 | Extra rate for providing and mixing water proofing material in cement concrete work in the proportions recommended by the manufacturers. | 1 | 18000 | 18000 |