S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 9840 | 6.65 | 65436 |
2 | Transportation of metal | 1 | 88000 | 88000 |
3 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 0 | 0 | 0 |
4 | SIGN BOARD | 1 | 3644 | 3644 |
5 | Lossening of hard soil by ploughing the existing gound | 9988 | 3.6 | 35956.8 |
6 | Supplying of Bamboo tree guard in triangular in shape each jali size 1.65 m x 0.45 m having with horizontal and verticle cross members maximum spacing 7.5cm x 7.5 cm to protect from goat / cattles. | 105 | 149.83 | 15732.15 |