State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KAITHORA
Work Code: 1711003043/IF/1000066899 (KAPIL DHARA VIJAY SINGH / RAM SINGH LODHI)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/10/2013 Work start date : 21/1/2014
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1072/1072 Sanction Date : 5/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
159234 176376 0 0 0 0 0 177000 0 335610
Financial Sanction Details
Financial\Administrative Sanction No: 05/05/K Financial\Administrative Sanction Date 15/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:335610 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
336000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency194839483
3Work charge810008000
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead188.221.94121.58
5Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m239.235.88563.36
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)22.954165.1895590.881
7False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift334.41223.874840.958
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars418.954.422788.16
9TRANSPORTATION OF MATERIAL11596215962
10Transportation of metal 24.3176.874297.941
11Labour only for boulder soling hand packed excluding consolidation.10.8106.21146.96
12Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal grading-2 & 3 as per MOST 2004 clause 400.2.5 including dressing.8.155.7451.17
13Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.75.423.6127.44
14Providing and laying in trenches 6.0kgf/sqcm working pressure polyethylene pipes of the following outside diameter low density complete with special flange compression type fitting (earth work in trenches is to be measured and paid for separately)-50 mm dia.353.8161.4
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work400.4200.480240.16
16Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil2798.142649.78
17Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm)8.13763045.6
18Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.10.8100.31083.24
19Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.5.4139.1751.14
Total Activity 336000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL19.5120023400
240 M.M. METAL8.12582089.8
3boldar10.82883110.4
4Cement(bori)12832040960
5Centering and Shuttering334.41123.341232.753
6Contagecny152965296
7dewatering810008000
8Display board120002000
9IRON SARIYA418.949.820861.22
10P V C PIPE 21174174
11Sand9.36130012168
12Transpotation Charges11562315623
13बजरी5.42531366.2
Total Material 177000